walking up the stairs - matt opened the wall where we'll put a half-door which'll access a finished crawl-space for storage.
this is the mini-dormer that'll be perfect for a little nook for the little ones.
hey, i like my new room! connor opening the door to his room. the hardwoods were there (!) but will be covered by carpet.
this is going to be the crawl space. the studs on the right will be removed and there will be a good 40 square feet of storage - perfect for stacking boxes...after we cull through our junk!
Posted by Picasa

killing me!


the original siding was lap cedar and cedar shake - which was covered by vinyl. the corbles were even removed and not put back (you can see the dark spot at the peak of the gable where the corble once supported the roof). mad dog will be adding new corbles.